Analysis of Facility Layout Design to Improve Production Efficiency Using the Systematic Layout Planning (SLP) Method: A Case Study at CV. XYZ
DOI:
https://doi.org/10.52330/jtm.v24i2.547Keywords:
Facility Layout, Systematic Layout Planning, BLOCPLAN, Material Handling, Production EfficiencyAbstract
The increasing complexity of manufacturing systems requires companies to continuously improve production efficiency through effective facility layout design. CV. XYZ, a manufacturer of 10-ton wooden drums, experiences inefficiencies caused by long material handling distances, backtracking movements, and high operational costs resulting from its existing production layout. This study aims to optimize the facility layout using the Systematic Layout Planning (SLP) method integrated with BLOCPLAN software to identify the most efficient layout alternative. Primary data were collected through direct observation, time studies, interviews with production personnel, and documentation of workstation dimensions and production flow. The proposed layouts were evaluated using Activity Relationship Chart (ARC), Activity Relationship Diagram (ARD), material handling distance, travel time, and material handling cost (OMH). The results indicate that the SLP-based layout reduced material travel distance by 38%, travel time by 38%, and material handling cost by 25%, while the BLOCPLAN layout achieved reductions of 35%, 35%, and 20%, respectively. Compared with the algorithm-generated layout, the manually developed SLP layout provided superior operational efficiency while maintaining existing production constraints. The novelty of this research lies in the quantitative comparison between manual SLP and algorithm-based BLOCPLAN layouts for a complex wooden drum manufacturing process involving 31 production stages. The findings provide practical guidance for improving facility layout efficiency in wood-based manufacturing industries.
References
Ali Naqvi, S. A., Fahad, M., Atir, M., Zubair, M., & Shehzad, M. M. (2016). Productivity improvement of a manufacturing facility using systematic layout planning. Cogent Engineering, 3(1). https://doi.org/10.1080/23311916.2016.1207296
Darunanto, D., Endang Wahyuni, R., Saidah, D., & Binarti, I. (2023). Implementation of the Lean Manufacturing Concept to Reduce Waste in Spare Part Repair Activities at PT. X. In International Journal of Science and Society (Vol. 5, Number 2). http://ijsoc.goacademica.com
Fajaruddin, A., Pettawali, L., Zainuddin, Z., Saputra, J. C., Nasihardani, D., & Pujianto, H. (2025). Analisis Risiko Rantai Pasok Menggunakan Metode House Of Risk (HOR) pada CV. Padaidi. Jurnal Rekayasa Sistem Industri, 14(2). https://doi.org/10.26593/jrsi.v14i2.9156.229-242
Febri, C. A., & Susilawati, A. (2022). Mechanical and Aerospace-Science and Engineering-30 th. Journal of Ocean, 66(1), 8–13. www.isomase.org.,
Halim, G., Gozali, L., Kristina, H. J., & Robin, C. (2024). Perancangan Tata Letak Relokasi Lantai Produksi dengan Metode Systematic Layout Planning, Blocplan, dan FLAP.
Hasan Bisri, M., & Cahyana, A. S. (2023). Production Facility Layout Redesign Using Systematic Layout Planning And Blocplan Methods. In Procedia of Engineering and Life Science (Vol. 3).
’Heragu, S. (2008). Facilities Design (Heragu & Sunderesh, Eds.; 3rd ed.). Taylor & Francis Group.
Hernawati Suryatman, T., Engkos Kosim, M., & Muttaqien, Z. (2024). Perbaikan Tata Letak Mesin dengan Metode Systematic Layout Planning (SLP) di PT Prisma Rekayasa Unggul Improvement of Machine Layout Using Systematic Layout Planning (SLP) Method at PT Prisma Rekayasa Unggul. Journal Industrial Manufacturing, 9(2), 101–110.
Khofiyah, N. A., Novika, W., Kresna Ramadhan, D., Rizkia Feriaty, S., & Suri, A. (2024). Perbaikan Tata Letak Fasilitas untuk Meningkatkan Produktivitas dan Kepuasan Pelanggan pada UMKM Laundry. Jurnal Pengabdian Kepada Masyarakat Nusantara, 5(2), 2143–2150. https://doi.org/10.55338/jpkmn.v5i2.3193
Khofiyah, N. A., Rizki, M., Gea, B., Wiyatno, T. N., & Supriyati. (2023). Evaluasi Tata Letak Fasilitas Pabrik untuk Meningkatkan Efisiensi Kinerja Menggunakan Metode SLP (Systematic Layout Planning): Studi Kasus PT. XYZ. G-Tech: Jurnal Teknologi Terapan, 7(4), 1633–1642. https://doi.org/10.33379/gtech.v7i4.3269
Kustriyanto, E., Pambuditama, I., & Irawan, Y. S. (2016). PERBAIKAN LAYOUT MESIN PRODUKSI LONGSONG MUNISI MENGGUNAKAN METODE SYSTEMATIC LAYOUT PLANNING DAN BLOCPLAN (Studi Kasus: Divisi Munisi-PT. Pindad (Persero). Jurnal Rekayasa Mesin, 7(3), 103–112.
Marti-Puig, P., Touhami, I. A., Perarnau, R. C., & Serra-Serra, M. (2024). Industrial AI in condition-based maintenance: A case study in wooden piece manufacturing. Computers and Industrial Engineering, 188. https://doi.org/10.1016/j.cie.2024.109907
Nasihardani, D., Pujianto, H., & Rallyano, M. Y. (2024). Minimasi Pemindahan Bahan dengan Metode Systematic Layout Planning di PT Aristo S.M.I. Proceeding Mercu Buana Conference on Industrial Engineering, 6, 170–181.
Roca-Limache, C. J., Quispe-León, D. M., & Tupia-De-La-Cruz, E. L. (2025). Designing a Lean Production Model Using 5S and Systematic Layout Planning for Efficiency in Footwear Manufacturing: A Case Study. International Journal of Recent Engineering Science, 12(1), 33–42. https://doi.org/10.14445/23497157/ijres-v12i1p105
Salins, S. S., Zaidi, S. A. R., Deepak, D., & Sachidananda, H. K. (2024). Design of an improved layout for a steel processing facility using SLP and lean Manufacturing techniques. International Journal on Interactive Design and Manufacturing, 18(6), 3827–3848. https://doi.org/10.1007/s12008-024-01828-9
Yulia, N. T., & Cahyana, A. S. (2022). Facility Relayout Using Systematic Layout Planning and Blocplan Methods to Minimize Material Handling Distance Relayout Fasilitas Menggunakan Metode Systematic Layout Planning dan Blocplan Guna Meminimasi Jarak Material Handling (Vol. 2, Number 2).
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Jurnal Teknologi dan Manajemen

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
















